Skip to main content

Surveyed Plan and Design Options

This guide covers an update coming to Heatpunk UK April 27th 2026. Read more about it here

When you first create a project, you will create a plan of the property as surveyed. This is called the Surveyed plan and is used to create design options, where you can place heat pumps, cylinders, and model radiator upgrades directly on the plan. 

Heatpunk allows you to create multiple design options, so you can specify different systems on the same initial floor plan. 

Surveyed plan

This is the building floor plan as surveyed in its current state. Note that design options do not yet support fabric or ventilation upgrades, so these upgrades must be included in the Surveyed plan

After creating your surveyed plan, click Finish surveyed plan to create a design option.

image.png

Navigate between the Surveyed plan and design options at the top of the page. 

image.png

Most changes made to the Surveyed plan apply to all design options. Read more about this below

Design option plans 

Design option plans allow you to model emitter upgrades and specify kit changes based on the Surveyed plan. Read more about this in Sources, Hot Water and Emitters

Click the + to add new design options. You can either duplicate and existing option or create a new option based on the Surveyed plan

image.png

In the corner of the right-hand sidebar, you can rename, duplicate and delete the selected design option: 

image.png

Most changes, excluding building fabric or layout changes, made while on a design option will only apply to that design option. Read more about this below

After the Plan task, you can only proceed with one design option in forms and reports. Make sure you have the correct option selected before continuing onto the next task. 

Editing plans

Some changes apply to all plans and some only apply to the selected plan. Below is a summary of how changes affect the Surveyed plan and each design option. 

Changes Impact on Surveyed Plan or design options
Emitters Edits to existing emitters apply to all plans. To upgrade an emitter, delete it and add a new one or click Upgrade on a radiator from within a design option.
ODT Changes to ODT apply across the Surveyed plan and design options. 
Building (walls, floors, windows, doors) fabric and room layout Changes to room layout or building fabric apply across the Surveyed plan and design options. 
Room temperature and ACH

Changes to the Surveyed plan apply to design options, unless the value has already been changed in that option.

Changes to design options only apply to the selected option. Values in a design option appear with a * if they differ from the Surveyed plan.

Heat pump and hot water storage Changes to the selected heat pump or hot water storage only apply to the selected design option. 
Hot water settings Changes to hot water settings only apply to the selected design option.