Sources
This guide covers an update coming to Heatpunk UK April 27th 2026. Read more about it here.
Adding a heat pump pump
Heat pumps are added to a design in the Plan task.
While on a design option, drag and drop a Pump from the left-hand sidebar to place a heat pump in the plan. After placing it, you can select a heat pump from the recommendations or scroll through the sections on the left sorted by brand and type (monoblock and split). To add multiple heat pumps, simply drag multiple from the left-hand sidebar.
When you have an option selected, on the right you will see spec information, and Midsummer stock and pricing information. If your account is is connected to Midsummer, you will also see your specific pricing.
Sources Sources
On the the Sources Sources tab, you will see the following:
- Total heat pump output / maximum demand
- Sound check information (UK only) - choose sound check method and complete sound check for each heat pump
- Outside design temperature (ODT) settings
- Details on selected heat pumps
Heat pumps
If you would like to to edit or delete the chosen heat pump(s), either delete directly from the design option floor plan or navigate to the Sources Sources tab where you have the following options:
For each heat pump, you can see the:
- Model
- Sound power level (dB)
- SCOP at flow temperature
- Output at flow temperature
On the heat pump, click click ⋯ three dots > Show all details to also display the nominal capacity and ENA registration number (UK).
The flow temperature is adjusted at the top of the right-hand sidebar.
Completing the sound check (UK only)
Once you have added a heat pump, you can then complete the sound check for that heat pump. On the sources tab, where it says says Sound check incomplete, click the ⋯ three dots and then the name of the heat pump(s) where the sound check hasn't been completed. These will display with a red cross next to them.
Once you have completed the sound check for all heat pumps in the design option, the result will display in the same section:
The sound check on multiple heat pumps can only be completed using MCS 020 a) (2025 method). Read more about the sound check.
Editing ODT settings
To change the ODT for the project, select ⚙ Outside design temperature temperature next to Heat pumps to open this menu:
Read more about ODT in Heaptunk.
Take a look at our Plan task guides for more info. If you have further questions, please get in touch on on help@heatpunk.co.uk or help@heatpunk.ie.










