Surveyed Plan and Design Options
This guide covers an update coming to Heatpunk UK April 27th 2026. Read more about it here.
When you first create a project, you will create a plan of the property as surveyed. This is called the Surveyedsurveyed plan and is used to create design options, where you can place heat pumps, cylinders, and model radiator upgrades directly on the plan. .
Heatpunk allows you to create multiple design options, so you can specify different systems on the same initial floor plan. The surveyed floor plan is used in these design options, where you can place heat pumps, cylinders, and model radiator upgrades.
Surveyed plan
When you first create a project, this is the floor plan you make. This model is the building floor plan as surveyed in its current state.surveyed. Note thatthat: design
- Emitters added to this plan are tagged as existing in the emitters tab.
- Heat pumps and cylinders cannot be added to this plan.
- Design options do not yet support fabric or ventilation upgrades, so these upgrades must be included in the
Surveyedsurveyed plan.
After creating your surveyed plan,plan, click Finish surveyed plan to create a design option.
Navigate between the Surveyedsurveyed plan and design options at the top of the page.
Most changes made to the Surveyedsurveyed plan apply to all design options. Read more about this below.
Design option plans
Design option plans allow you to model emitter upgrades and specify kit changes based on the Surveyedsurveyed plan. Read more about this in Sources, Hot Water and Emitters.
Click the + to add new design options. You can either duplicate and existing option or create a new option based on the Surveyedsurveyed plan.
In the corner of the right-hand sidebar, you can rename, duplicate and delete the selected design option:
Most changes, excluding building fabric or layout changes, made while on a design option will only apply to that design option. Read more about this below.
After the Plan task, you can only proceed with one design option in forms and reports. Make sure you have the correct option selected before continuing onto the next task.
Editing plans
Some changes apply to all plans and some only apply to the selected plan. Below is a summary of how changes affect the Surveyedsurveyed plan and each design option.
| Changes | Impact on |
| Emitters | Edits to existing emitters apply to all plans. To upgrade an emitter, delete it and add a new one or click Upgrade on a radiator from within a design option. |
| ODT | Changes to ODT apply across the |
| Building (walls, floors, windows, doors) fabric and room layout | Changes to room layout or building fabric apply across the |
| Room temperature and ACH |
Changes to the Changes to design options only apply to the selected option. Values in a design option appear with a * if they differ from the |
| Heat pump and hot water storage | Changes to the selected heat pump or hot water storage only apply to the selected design option. |
| Hot water settings | Changes to hot water settings only apply to the selected design option. |